On VibeKaizen we gave large tasks to Claude and small ones to the platform model: a neighbourhood events site, 10 tasks, about $11.40, one afternoon.

, founder ·

In our earlier runs each project used one model: either a strong, expensive one or the cheap platform model. But tasks aren't all equally hard. A list screen and an attendance system don't deserve the same model. In this run we mixed them: large tasks went to Claude, small ones to the platform model.

The idea and the start

The idea was a neighbourhood events site. We gave the product owner one line (in Turkish): "An announcement site for neighbourhood events: add an event with date, place and description, list and filter, an I'm-going button. Sign-up by email."

We started it the same day, right after the habit tracker on the platform model finished. That run left us with an obvious question: if the cheap model is this good on small jobs, why not keep a strong model just for the big ones?

There was no Figma file. In the model settings we put all four roles on Claude Sonnet 5.5 with our own Anthropic key, with one exception: when a task was small (the two smallest sizes), the developer would be the platform model, DeepSeek V4.1 Flash. Reviews stayed on Claude for every task.

Our reasoning was simple. On a small task the chance of a costly mistake is low, so a cheap model will do. On a big task a wrong decision carries into the tasks after it, so the strong model earns its price. Keeping reviews on the strong model is insurance. The product owner and the architect decide during planning which tasks are small and which are large; we only set the rule.

The team at work

With no design, the product owner asked about the look first. Two questions from the planning records (translated):

"Which direction should the look take? Default: warm and friendly, coral red; it feels like a neighbourhood without looking corporate."

"Who can add events? Default: any signed-in member; in that case nobody approves them, so inappropriate announcements could be published."

We asked for turquoise and a cream background alongside the coral. We let every member add events; the question had already spelled out the risk. Only four questions this time; the request was short but clear. The architect also asked the small things that are easy to miss, like "Can the organizer say 'I'm going' to their own event?"

The architect's objections were especially interesting here, because they predicted the problem we'd hit later. Adding events and filtering touched the same screens and files, and so did attending and the organizer's screen, but nothing set an order between them. It suggested chaining them. It also noticed that no task prepared the data the event detail screen needed.

The final list: the skeleton, the design foundation, sign-up, the upcoming events list, publishing an event, filtering by date and place, the event detail, "I'm going", and organizers managing their own events. The small ones went to the platform model, the medium ones to Claude. So tasks could run side by side, we raised the project's parallel-work setting above one.

What came out

A visitor sees upcoming events, filters by date and place, and opens the details. Any member can publish an event and say "I'm going"; organizers manage their own events. Past events are hidden by default and come back with a filter. Every task passed review in the first round, with only minor findings.

Upcoming events with filters
Upcoming events with filters
Event detail with the I'm going button
Event detail with the I'm going button
The organizer's own events
The organizer's own events

At the end we ran one more experiment: we deleted our Anthropic key from the project. With the key gone, all four roles moved to the platform model on their own. Then we asked the product owner in the chat for something new: adding an event to your calendar. The product owner and architect turned that into a task for about two cents on the platform model; the task was written in 21 minutes, reviewed on the platform model and approved. Development cost about 22 cents, the review 4. Nothing stopped and we didn't reconfigure anything. A project doesn't stall if you have trouble with a provider or want to cut your bill.

You can try the demo here.

How long it took, what it cost

  • Tasks: 10, all approved. Nine in the first sprint (skeleton included); the calendar task in a small second sprint after we removed the key.
  • Cost: about $11.40. Claude's share was $6.60 (building $4.52, reviewing $1.57, planning $0.51), paid to the provider on our own key; the platform model's share was $4.80, taken from the plan balance at the published rate.
  • Agent working time: 2 hours 57 minutes. On the calendar, under four hours from the start of planning to the last approval: one afternoon.
  • Review: 9 rounds, all approved first time.

The numbers show why mixing works. A small task that went smoothly cost about 50 cents, Claude's review included, and took 23–31 minutes. The medium tasks Claude wrote cost between $1.16 and $1.70 and took 16–27 minutes. On small jobs the platform model was about three times cheaper and a bit slower. Its own share, from the balance: 34 cents for the list screen, 28 for the filter, 36 for the detail screen.

Our part was answering questions, trying and approving each task in a preview, and changing the parallel-work setting. We didn't reject anything. But we had to give four extra approvals; here's why.

How it could have gone better

Lesson one: tasks running side by side can collide. When tasks moved in parallel and one was approved and added to the app's shared code, the files the other one had changed were suddenly out of date. That happened four times: twice on sign-up, twice on "I'm going". The developer resolved the collision each time, but it cost about $1.90 extra and four extra approvals. Since then we've changed the platform's order of work: if the shared code has moved on, a task is updated before it goes into testing, collisions are resolved early in the same developer session, and they no longer count against the task's retry limits. The parallel-work setting now also starts at a sensible value for your plan.

Lesson two: every step of an acceptance test has to be doable. One task's "how to test" steps asked us to open the admin panel, but the preview had no admin account. Every preview now has an admin account, and the task card shows buttons that set up the state a test needs in one click.

What you can do: We built this site from a one-line idea, stayed close to the defaults, left the task breakdown untouched, and never said "build this screen like that" or "use this icon". More detail in the wizard, your own answers to the product owner, edits to the task list, role instructions in Settings and clear notes when you reject a task will very likely give a better result. Without a design, describe the look you want: we only named colours, but you can also say how event cards should be laid out, whether to use photos, and who the site is for. Our VibeKaizen guide shows where to start.

You choose which role and which task size runs on which model, and if you remove your key, work carries on with the platform model. A fully keyless run is in this post. Approving the plan and every task stays with you either way. Prices are on the pricing section.

Big idea or small one, try it with your own.